temp
temp
temp
temp
temp
temp
temp


Site Plan


DownLoad PDF

Ground Floor


DownLoad PDF

First Floor


DownLoad PDF

Elevation


DownLoad PDF

EARTH WORK EXCAVATION

Note: Unless otherwise specified rate quoted shall include the following:

(1)Site clearance such as clearing shrubs undergrowth roots & small trees brush wood, etc.

(2) Setting out the work to profile etc.

(3)Bailing or otherwise removing all water which may accumulate in the excavation pit or trench from all causes.

(4)Setting out the throwing soil clear off the area being excavated or depositing clear edge of foundation to avoid fall in.

(5)Trimming all sides plumb or otherwise as instructed at site , & square leveling all bottoms, clearing out all loose earth, etc.,

(6)Filling back by sides of foundation & in plinth, in layers not exceeding 150mm thick watering, consolidating & dressing etc.

(7)Disposing surplus earth outside the site to places not objected by civic authorities,& dressing to proper level & grade as required.

(8) Dismantling , removing & stacking existing water pipes from within the excavated portion as directed.

(9)Providing shoring & strutting to sides to foundation required Read More....